Ziqqle Rapid Engineering

From idea to working software. Faster.

Reusable modules and automated checks shorten the path to a first working version when the scope allows.

Ziqqle Rapid Engineering

Match the delivery model to the work

Rapid prototype

One key workflow and sample data.

A runnable iteration and a criterion for the next stage.

A first version can take hours for a narrow scope. It needs an example, a decision on the core workflow and a reviewer.

Express implementation

Adaptation of existing modules.

Agreed features, staging environment and acceptance evidence.

For a small agreed configuration, 3–7 days can be a scope-specific estimate after review. Data and sandbox access must be ready.

Custom enterprise delivery

Bespoke rules, integrations and migration.

Architecture, integrations, tests, training and staged handover.

Milestone estimates follow analysis of dependencies, volumes, security and acceptance criteria.

From brief to acceptance

  1. Scope

    The buyer defines the workflow and success criterion. Ziqqle records boundaries and dependencies.

  2. Architecture

    We compare existing modules with missing functionality and decide what to build.

  3. Working version

    We implement the agreed scenario with sample data and provide a review environment.

  4. Integration and QA

    We verify data, interfaces and edge cases. The buyer provides sandbox access.

  5. Acceptance and release

    The buyer performs UAT. After sign-off, both parties schedule release, training and support.

Illustrative schedule

Seven days for a small configuration

An example with ready data and sandbox access, limited integrations and an available reviewer. The schedule is assessed and agreed per project.

  1. Day 1Scope, access and configuration
  2. Day 2Core workflow
  3. Day 3Data and agreed integrations
  4. Day 4QA and fixes
  5. Day 5Training and UAT
  6. Day 6Acceptance-test fixes
  7. Day 7Sign-off, release and handover

Engineering evidence

ARQVENTO

All 18 individual scenarios passed. The runner reports 19 passing results including the enclosing test.

2026-11-25

OQVARMELIX

One integration test passed, covering online orders, till sales, stock movements, returns and persistence after restart.

2026-11-25

ZIQMAVORYX

All 11 API tests passed against temporary databases, covering production operations, simulation, document revisions and recovery.

2026-11-25

Scope, dependencies and dates

When is an accelerated date realistic?

For a bounded CRM workflow, a report backed by ready data, a standard storefront or a documented API with a sandbox. We confirm after review.

What can extend the schedule?

Missing data, migrations, fiscal integrations, physical PLCs, security reviews, external approvals and training need their own time.

How do you distinguish a prototype from an accepted system?

We record prototype readiness, feature completion, customer acceptance and production release separately. Warranty and support have their own agreed term.

How can we verify speed and quality?

For a bid, we agree milestones, acceptance records and tests. Demo tests show which features were verified. Public duration measurements are unavailable.

How do we send confidential requirements?

Start with a non-confidential summary. For restricted material, the parties agree a protected channel.

How do you set a bid deadline?

We review tender conditions, dependencies and UAT windows. We propose an accelerated schedule only when the procedure allows it and the scope supports it.